• product up1

Products

Wholesale Ppr Pipe Molds - UPVC Yee Tee Pipe Fitting Mould – Longxin

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

abide by the contract", conforms into the market requirement, joins in the market competition by its good quality also as provides a lot more comprehensive and great company for purchasers to let them turn into huge winner. The pursue from the firm, would be the clients' gratification for Collapsible Pipe Fitting Mould, Polyethylene Pipe Fittings Mould, 40mm Upvc Pipe Mould, We always stick to the principle of "Integrity, Efficiency, Innovation and Win-Win business". Welcome to visit our website and do not hesitate to communicate with us. Are you ready? ? ? Let us go!!!
Wholesale Ppr Pipe Molds - UPVC Yee Tee Pipe Fitting Mould – Longxin Detail:

Quick Details

Origin: Taizhou, Zhejiang, China

Brand: UPVC mould

Model:UPVC Yee Tee Pipe Fitting Mould

Moulding mode: plastic injection mould

Product material: Steel

Products: household goods

Name: China high quality plastic UPVC Yee Tee Pipe Fitting Mould

Cavity: 2 cavities

Design: 3D or 2D

Runner type: cold runner

Die steel: p20h / 718 / 2316 / 2738, etc

Mould base: LKM, HASCO, DME

Mould life: 500000

Sampling time: 60-90 days

Colors: all colors

UPVC Yee Tee Pipe Fitting Mould

The main Mould Steel and Hardness for you reference:
Steel Grade S50C P20 P20HH 718H 2738H H13 S136 NAK80
Hardness(HRC) 17-22 27-30 33-37 33-38 36-40 45-52 48~52 34-40

Pipe Fitting Mould Features :High Automation multi cavities ,high precision,high productivity, long-lasting lifeWe have our own unique design for some moulds,

Our services

We longxin adhering to the principle of quality first, service first to serve each of our customers, professional production of PVC Sewage Or Y Tee Pipe Fitting Mould, Welcome to call and order

1. In-time response on letters, telephone calls or fax

2. In-time supply the quotation and mould designs

3. In-time sending pictures for the mould machining progress and mould finishing schedule

4. In-time sending pictures for the mould machining progress and mould finishing schedule

5. In-time mould delivery.

For more information please contact us.

Packing and delivery

How to pack PVC  Tee Pipe Fitting Mould flaring in wooden case:

First  : Daub rust preventive oil on the mould.

Second : We pack the mold with thin plastic film to avoid moisture.

Third : We put this plastic film packed mould in a wooden box, and fix it avoid any movement.

Packing size of wooden case: according to mould size

Port:Ningbo

UPVC Yee Tee Pipe Fitting Mould
Package delivery

FAQ:

Finally, a pair of pipe fitting molds have been made. Next, we have to test the effectiveness of the mold, that is, mold trial. Then put it into production, and how to maintain the mold during production, so that the mold can be in a better working condition and let us reap the greatest benefits?

Below we will introduce the things that we should pay attention to when trying out our pipe fitting molds for this UPVC Yee Tee pipe fitting molds:

1. Whether the mold opening and closing is smooth, and whether the ejection is smooth.

2. Pay attention to the position of the mold gate and the way of glue feeding, the size of the gate and the size of the cavity, and select the appropriate pressure, speed, and material volume for injection molding. 3. After the mold heats up, carefully check whether all the matching parts of the mold are too hard, and then confirm the bonding line and exhaust. After the product is full, ask the quality personnel to confirm the size and appearance.

4. During the mold production process, check the mold settings and safety devices to let the operating staff understand the possible problems in the process. After the production is completed, the lower mold or standby needs to take necessary measures for the machine and mold.

5.When the mold is not in production, the pipe fitting mold should be maintained. First check the mold and determine the maintenance method. If you need to disassemble the parts, first check whether there is a clear mark. After the maintenance of the parts is completed, the assembly should be matched and seated. After the assembly is completed, first confirm the sequence of the mold. Pay attention to the careful inspection and confirmation of the first piece after each maintenance, and the production can be continued after the quality personnel confirm OK.


Product detail pictures:

Wholesale Ppr Pipe Molds - UPVC Yee Tee Pipe Fitting Mould –  Longxin detail pictures

Wholesale Ppr Pipe Molds - UPVC Yee Tee Pipe Fitting Mould –  Longxin detail pictures

Wholesale Ppr Pipe Molds - UPVC Yee Tee Pipe Fitting Mould –  Longxin detail pictures


Related Product Guide:

With our excellent administration, potent technical capability and strict top quality control technique, we go on to provide our consumers with trusted quality, reasonable price ranges and fantastic providers. We intention at becoming one among your most trusted partners and earning your fulfillment for Wholesale Ppr Pipe Molds - UPVC Yee Tee Pipe Fitting Mould – Longxin , The product will supply to all over the world, such as: Botswana, Jordan, Poland, During the 10 years of operating, our company always try our best to bring consumption satisfaction for user, built a brand name for ourselves and a solid position in the international market with major partners come from many countries such as Germany, Israel, Ukraine, United Kingdom, Italy, Argentina, France, Brazil, and so on. Last but not least, price of our products are very suitable and have fairly high competition with other companies.
  • The accounts manager made a detailed introduction about the product, so that we have a comprehensive understanding of the product, and ultimately we decided to cooperate.
    5 Stars By Amy from Gabon - 2018.09.08 17:09
    Speaking of this cooperation with the Chinese manufacturer, I just want to say"well dodne", we are very satisfied.
    5 Stars By Grace from Anguilla - 2018.02.08 16:45
    Write your message here and send it to us