• product up1

Products

OEM/ODM Factory Upvc Swr Pipe Mould - Upvc 45°Elbow Fitting Mould – Longxin

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

To be the stage of realizing dreams of our employees! To build a happier, more united and more professional team! To reach a mutual benefit of our customers, suppliers, the society and ourselves for Pp-R Fitting Mould Elbow 45°, China Pipe Fitting Mould Manufacturer, Ppr Pipes Mould, We sincerely welcome customers from both at home and abroad to come to negotiate business with us.
OEM/ODM Factory Upvc Swr Pipe Mould - Upvc 45°Elbow Fitting Mould – Longxin Detail:

Quick details

Origin: Taizhou, Zhejiang, China

Brand: PVC mould

Model: PVC 45 °flaring die

Moulding mode: plastic injection mould

Product material: Steel

Products: household goods

Name: China high quality plastic PVC pipe fitting mould

Cavity: 2 cavities

Design: 3D or 2D

Runner type: cold runner

Die steel: p20h / 718 / 2316 / 2738, etc

Mould base: LKM, HASCO, DME

Mould life: 500000

Sampling time: 60-90 days

Colors: all colors

Elbow Fitting Mould

The main Mould Steel and Hardness for you reference:
Steel Grade S50C P20 P20HH 718H 2738H H13 S136 NAK80
Hardness(HRC) 17-22 27-30 33-37 33-38 36-40 45-52 48~52 34-40

How to pack PVC  Tee Pipe Fitting Mould flaring in wooden case:

First  : Daub rust preventive oil on the mould.

Second : We pack the mold with thin plastic film to avoid moisture.

Third : We put this plastic film packed mould in a wooden box, and fix it avoid any movement.

Packing size of wooden case: according to mould size

Port:Ningbo

Package delivery

FAQ

Q1: Are you a trading company or a manufacturer?

A: We are A factory.

Q2: How do I get to your factory?
A: You can come to our city by plane, bus or train.It takes 2 hours to fly from Guangzhou to our city.It takes 3.5 hours to get to our city from Shanghai by train.It’s only an hour by train from Ningbo to our city.

Q3: What is the quality control in your factory?
A: We believe that “quality is above everything”. We have A professional team to control the quality. Our quality control team mainly performs the following steps:
A: Design optimization control B: hardness inspection of mold steel C: pipe fitting mold assembly inspectionD: Mould test report and sample inspection of pipe fitting E: final inspection of mould and package before shipment. If you have any other questions, please feel free to contact us as follows:

Q4: If I provide you with 3D drawings of the product, can you quote and make molds according to the 3D drawings?
A: Yes.DWG, DXF, STEP, IGS, and X_T files can be used to quote and make molds based on your model – this can save time and money in producing parts.What kind of mould can you make?
A: We can manufacture all kinds of plastic injection molds, PVC, PPR, PE and other pipe fittings molds. We can recommend the appropriate number of cavities according to the size of the injection molding machine

Q5: What are your terms of payment?
A: By t/T, L/C, trade guarantee and Western Union.

Q6: How long is your delivery time for molds?
A: After the mold drawing is approved, it takes 8-12 weeks to manufacture the mold, depending on the mold structure and the number of cavities (single or multiple). Delivery date will be calculated from the date when you approve our mold drawing. After you confirm our final sample, we can send you the plastic mould within one week.


Product detail pictures:

OEM/ODM Factory Upvc Swr Pipe Mould - Upvc 45°Elbow Fitting Mould –  Longxin detail pictures

OEM/ODM Factory Upvc Swr Pipe Mould - Upvc 45°Elbow Fitting Mould –  Longxin detail pictures


Related Product Guide:

Our solutions are broadly acknowledged and dependable by users and may meet consistently developing economic and social requires for OEM/ODM Factory Upvc Swr Pipe Mould - Upvc 45°Elbow Fitting Mould – Longxin , The product will supply to all over the world, such as: Ecuador, Nigeria, Swaziland, Meanwhile, we're building up and consummating triangle market & strategic cooperation in order to achieve a multi-win trade supply chain to expand our market vertically and horizontally for a brighter prospects. development. Our philosophy is to create cost-effective products and solutions, promote perfect services, cooperate for long-term and mutual benefits, firm a in depth mode of excellent suppliers system and marketing agents, brand strategic cooperation sales system.
  • The supplier abide the theory of "quality the basic, trust the first and management the advanced" so that they can ensure a reliable product quality and stable customers.
    5 Stars By Penelope from Mauritius - 2018.10.01 14:14
    This company conforms to the market requirement and joins in the market competition by its high quality product, this is an enterprise that have Chinese spirit.
    5 Stars By Ingrid from Muscat - 2018.06.12 16:22
    Write your message here and send it to us