High Quality Ppr Pipe Fitting Mould Elbow 90 - CPVC Tee Pipe Fitting Mould – Longxin
High Quality Ppr Pipe Fitting Mould Elbow 90 - CPVC Tee Pipe Fitting Mould – Longxin Detail:
Introduce
Customers who consult CPVC Tee Pipe Fitting Mould, please provide the following detailed requirements:
1. CPVC Tee Pipe Fitting Mould product picture and size, or (3D drawing)
2. How many cavities for different parts
3. The unit price needs to know the weight and raw materials
FAQ:
Finally, a pair of pipe fitting molds have been made. Next, we have to test the effectiveness of the mold, that is, mold trial. Then put it into production, and how to maintain the mold during production, so that the mold can be in a better working condition and let us reap the greatest benefits?
Below we will introduce the things that we should pay attention to when trying out our pipe fitting molds for this CPVC Tee Pipe Fitting Mould:
1. Whether the mold opening and closing is smooth, and whether the ejection is smooth.
2. Pay attention to the position of the mold gate and the way of glue feeding, the size of the gate and the size of the cavity, and select the appropriate pressure, speed, and material volume for injection molding.
3. After the mold heats up, carefully check whether all the matching parts of the mold are too hard, and then confirm the bonding line and exhaust. After the product is full, ask the quality personnel to confirm the size and appearance.
4. During the mold production process, check the mold settings and safety devices to let the operating staff understand the possible problems in the process. After the production is completed, the lower mold or standby needs to take necessary measures for the machine and mold.
5.When the mold is not in production, the pipe fitting mold should be maintained. First check the mold and determine the maintenance method. If you need to disassemble the parts, first check whether there is a clear mark. After the maintenance of the parts is completed, the assembly should be matched and seated. After the assembly is completed, first confirm the sequence of the mold. Pay attention to the careful inspection and confirmation of the first piece after each maintenance, and the production can be continued after the quality personnel confirm OK.
Product detail pictures:
Related Product Guide:
With our leading technology at the same time as our spirit of innovation,mutual cooperation, benefits and advancement, we will build a prosperous future with each other with your esteemed firm for High Quality Ppr Pipe Fitting Mould Elbow 90 - CPVC Tee Pipe Fitting Mould – Longxin , The product will supply to all over the world, such as: Norway, French, Guatemala, Excellent quality comes from our adherence to every detail, and customer satisfaction comes from our sincere dedication. Relying on advanced technology and industry reputation of good cooperation, we try our best to provide more quality products and services to our customers, and all of us are willing to strengthen exchanges with domestic and foreign customers and sincere cooperation, to build a better future.
By Queena from Danish - 2018.06.30 17:29
In China, we have purchased many times, this time is the most successful and most satisfactory, a sincere and realiable Chinese manufacturer!
By Henry stokeld from Durban - 2018.09.16 11:31