• product up1

Products

Factory Promotional Ppr Mould - UPVC Yee Tee Pipe Fitting Mould – Longxin

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

To meet the customers' over-expected satisfaction , we have our strong team to provide our best overall service which includes marketing, sales, designing, production, quality controlling, packing, warehousing and logistics for Plastic Pipe Fitting Mould, Fittings Pvc Pipe Mould Mould, Upvc Waste Pipe Mould, Our purpose is always to build Win-win scenario with our customers. We feel we are going to be your greatest choice. "Reputation To start with, Buyers Foremost. "Waiting for your inquiry.
Factory Promotional Ppr Mould - UPVC Yee Tee Pipe Fitting Mould – Longxin Detail:

Quick Details

Origin: Taizhou, Zhejiang, China

Brand: UPVC mould

Model:UPVC Yee Tee Pipe Fitting Mould

Moulding mode: plastic injection mould

Product material: Steel

Products: household goods

Name: China high quality plastic UPVC Yee Tee Pipe Fitting Mould

Cavity: 2 cavities

Design: 3D or 2D

Runner type: cold runner

Die steel: p20h / 718 / 2316 / 2738, etc

Mould base: LKM, HASCO, DME

Mould life: 500000

Sampling time: 60-90 days

Colors: all colors

UPVC Yee Tee Pipe Fitting Mould

The main Mould Steel and Hardness for you reference:
Steel Grade S50C P20 P20HH 718H 2738H H13 S136 NAK80
Hardness(HRC) 17-22 27-30 33-37 33-38 36-40 45-52 48~52 34-40

Pipe Fitting Mould Features :High Automation multi cavities ,high precision,high productivity, long-lasting lifeWe have our own unique design for some moulds,

Our services

We longxin adhering to the principle of quality first, service first to serve each of our customers, professional production of PVC Sewage Or Y Tee Pipe Fitting Mould, Welcome to call and order

1. In-time response on letters, telephone calls or fax

2. In-time supply the quotation and mould designs

3. In-time sending pictures for the mould machining progress and mould finishing schedule

4. In-time sending pictures for the mould machining progress and mould finishing schedule

5. In-time mould delivery.

For more information please contact us.

Packing and delivery

How to pack PVC  Tee Pipe Fitting Mould flaring in wooden case:

First  : Daub rust preventive oil on the mould.

Second : We pack the mold with thin plastic film to avoid moisture.

Third : We put this plastic film packed mould in a wooden box, and fix it avoid any movement.

Packing size of wooden case: according to mould size

Port:Ningbo

UPVC Yee Tee Pipe Fitting Mould
Package delivery

FAQ:

Finally, a pair of pipe fitting molds have been made. Next, we have to test the effectiveness of the mold, that is, mold trial. Then put it into production, and how to maintain the mold during production, so that the mold can be in a better working condition and let us reap the greatest benefits?

Below we will introduce the things that we should pay attention to when trying out our pipe fitting molds for this UPVC Yee Tee pipe fitting molds:

1. Whether the mold opening and closing is smooth, and whether the ejection is smooth.

2. Pay attention to the position of the mold gate and the way of glue feeding, the size of the gate and the size of the cavity, and select the appropriate pressure, speed, and material volume for injection molding. 3. After the mold heats up, carefully check whether all the matching parts of the mold are too hard, and then confirm the bonding line and exhaust. After the product is full, ask the quality personnel to confirm the size and appearance.

4. During the mold production process, check the mold settings and safety devices to let the operating staff understand the possible problems in the process. After the production is completed, the lower mold or standby needs to take necessary measures for the machine and mold.

5.When the mold is not in production, the pipe fitting mold should be maintained. First check the mold and determine the maintenance method. If you need to disassemble the parts, first check whether there is a clear mark. After the maintenance of the parts is completed, the assembly should be matched and seated. After the assembly is completed, first confirm the sequence of the mold. Pay attention to the careful inspection and confirmation of the first piece after each maintenance, and the production can be continued after the quality personnel confirm OK.


Product detail pictures:

Factory Promotional Ppr Mould - UPVC Yee Tee Pipe Fitting Mould –  Longxin detail pictures

Factory Promotional Ppr Mould - UPVC Yee Tee Pipe Fitting Mould –  Longxin detail pictures

Factory Promotional Ppr Mould - UPVC Yee Tee Pipe Fitting Mould –  Longxin detail pictures


Related Product Guide:

With our leading technology as well as our spirit of innovation,mutual cooperation, benefits and development, we will build a prosperous future together with your esteemed company for Factory Promotional Ppr Mould - UPVC Yee Tee Pipe Fitting Mould – Longxin , The product will supply to all over the world, such as: Pakistan, Jakarta, Ukraine, Furthermore, all of our items are manufactured with advanced equipment and strict QC procedures in order to ensure high quality. If you are interested in any of our goods, please don't hesitate to contact us. We will do our best to meet your needs.
  • The company keeps to the operation concept "scientific management, high quality and efficiency primacy, customer supreme", we have always maintained business cooperation. Work with you,we feel easy!
    5 Stars By Beulah from Puerto Rico - 2018.04.25 16:46
    High production efficiency and good product quality, fast delivery and completed after-sale protection, a right choice, a best choice.
    5 Stars By Kristin from Thailand - 2018.10.09 19:07
    Write your message here and send it to us