• product up1

Products

China OEM Upvc Plumbing Fittings Mould - Upvc 45°Elbow Fitting Mould – Longxin

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We now have a specialist, efficiency workforce to deliver excellent service for our purchaser. We always follow the tenet of customer-oriented, details-focused for Drain Pipe And Fittings Mould, Ppr Pipe Molds, Sewage Drainage Pvc Yee Pipe Fitting Mould, We think this sets us apart from the competition and makes prospects choose and trust us. We all wish to build win-win deals with our customers, so give us a call today and make a new friend!
China OEM Upvc Plumbing Fittings Mould - Upvc 45°Elbow Fitting Mould – Longxin Detail:

Quick details

Origin: Taizhou, Zhejiang, China

Brand: PVC mould

Model: PVC 45 °flaring die

Moulding mode: plastic injection mould

Product material: Steel

Products: household goods

Name: China high quality plastic PVC pipe fitting mould

Cavity: 2 cavities

Design: 3D or 2D

Runner type: cold runner

Die steel: p20h / 718 / 2316 / 2738, etc

Mould base: LKM, HASCO, DME

Mould life: 500000

Sampling time: 60-90 days

Colors: all colors

Elbow Fitting Mould

The main Mould Steel and Hardness for you reference:
Steel Grade S50C P20 P20HH 718H 2738H H13 S136 NAK80
Hardness(HRC) 17-22 27-30 33-37 33-38 36-40 45-52 48~52 34-40

How to pack PVC  Tee Pipe Fitting Mould flaring in wooden case:

First  : Daub rust preventive oil on the mould.

Second : We pack the mold with thin plastic film to avoid moisture.

Third : We put this plastic film packed mould in a wooden box, and fix it avoid any movement.

Packing size of wooden case: according to mould size

Port:Ningbo

Package delivery

FAQ

Q1: Are you a trading company or a manufacturer?

A: We are A factory.

Q2: How do I get to your factory?
A: You can come to our city by plane, bus or train.It takes 2 hours to fly from Guangzhou to our city.It takes 3.5 hours to get to our city from Shanghai by train.It’s only an hour by train from Ningbo to our city.

Q3: What is the quality control in your factory?
A: We believe that “quality is above everything”. We have A professional team to control the quality. Our quality control team mainly performs the following steps:
A: Design optimization control B: hardness inspection of mold steel C: pipe fitting mold assembly inspectionD: Mould test report and sample inspection of pipe fitting E: final inspection of mould and package before shipment. If you have any other questions, please feel free to contact us as follows:

Q4: If I provide you with 3D drawings of the product, can you quote and make molds according to the 3D drawings?
A: Yes.DWG, DXF, STEP, IGS, and X_T files can be used to quote and make molds based on your model – this can save time and money in producing parts.What kind of mould can you make?
A: We can manufacture all kinds of plastic injection molds, PVC, PPR, PE and other pipe fittings molds. We can recommend the appropriate number of cavities according to the size of the injection molding machine

Q5: What are your terms of payment?
A: By t/T, L/C, trade guarantee and Western Union.

Q6: How long is your delivery time for molds?
A: After the mold drawing is approved, it takes 8-12 weeks to manufacture the mold, depending on the mold structure and the number of cavities (single or multiple). Delivery date will be calculated from the date when you approve our mold drawing. After you confirm our final sample, we can send you the plastic mould within one week.


Product detail pictures:

China OEM Upvc Plumbing Fittings Mould - Upvc 45°Elbow Fitting Mould –  Longxin detail pictures

China OEM Upvc Plumbing Fittings Mould - Upvc 45°Elbow Fitting Mould –  Longxin detail pictures


Related Product Guide:

We insist on the principle of development of 'High quality, Efficiency, Sincerity and Down-to-earth working approach' to provide you with excellent service of processing for China OEM Upvc Plumbing Fittings Mould - Upvc 45°Elbow Fitting Mould – Longxin , The product will supply to all over the world, such as: Qatar, UK, Sudan, We firmly think that we have the full capability to present you contented merchandise. Wish to collect concerns within you and build a new long-term synergy romantic relationship. We all significantly promise:Csame excellent, better selling price; exact selling price, better quality.
  • The company can think what our think, the urgency of urgency to act in the interests of our position, can be said this is a responsible company, we had a happy cooperation!
    5 Stars By Janice from moldova - 2017.09.29 11:19
    The sales manager has a good English level and skilled professional knowledge, we have a good communication. He is a warm and cheerful man, we have a pleasant cooperation and we became very good friends in private.
    5 Stars By Jocelyn from Washington - 2017.11.11 11:41
    Write your message here and send it to us