• product up1

Products

2021 Latest Design Pvc Tubing Mould - CPVC Tee Pipe Fitting Mould – Longxin

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We now have several exceptional workers customers good at marketing, QC, and working with types of troublesome trouble during the creation system for 75mm Upvc Pipe Mould, Upvc Pipe Mold, Pvc 45°Elbow Fitting Mould, Our company is working through the procedure principle of "integrity-based, cooperation created, people oriented, win-win cooperation". We hope we can have a pleasant relationship with businessman from all around the earth.
2021 Latest Design Pvc Tubing Mould - CPVC Tee Pipe Fitting Mould – Longxin Detail:

Introduce

Customers who consult CPVC Tee Pipe Fitting Mould, please provide the following detailed requirements:

1. CPVC Tee Pipe Fitting Mould product picture and size, or (3D drawing)

2. How many cavities for different parts

3. The unit price needs to know the weight and raw materials

CPVC Tee Pipe Fitting Mould

FAQ:

Finally, a pair of pipe fitting molds have been made. Next, we have to test the effectiveness of the mold, that is, mold trial. Then put it into production, and how to maintain the mold during production, so that the mold can be in a better working condition and let us reap the greatest benefits?

Below we will introduce the things that we should pay attention to when trying out our pipe fitting molds for this CPVC Tee Pipe Fitting Mould:

1. Whether the mold opening and closing is smooth, and whether the ejection is smooth.

2. Pay attention to the position of the mold gate and the way of glue feeding, the size of the gate and the size of the cavity, and select the appropriate pressure, speed, and material volume for injection molding.

3. After the mold heats up, carefully check whether all the matching parts of the mold are too hard, and then confirm the bonding line and exhaust. After the product is full, ask the quality personnel to confirm the size and appearance.

4. During the mold production process, check the mold settings and safety devices to let the operating staff understand the possible problems in the process. After the production is completed, the lower mold or standby needs to take necessary measures for the machine and mold.

5.When the mold is not in production, the pipe fitting mold should be maintained. First check the mold and determine the maintenance method. If you need to disassemble the parts, first check whether there is a clear mark. After the maintenance of the parts is completed, the assembly should be matched and seated. After the assembly is completed, first confirm the sequence of the mold. Pay attention to the careful inspection and confirmation of the first piece after each maintenance, and the production can be continued after the quality personnel confirm OK.


Product detail pictures:

2021 Latest Design Pvc Tubing Mould - CPVC Tee Pipe Fitting Mould –  Longxin detail pictures

2021 Latest Design Pvc Tubing Mould - CPVC Tee Pipe Fitting Mould –  Longxin detail pictures

2021 Latest Design Pvc Tubing Mould - CPVC Tee Pipe Fitting Mould –  Longxin detail pictures


Related Product Guide:

Our business sticks for the basic principle of "Quality could be the life with the firm, and track record will be the soul of it" for 2021 Latest Design Pvc Tubing Mould - CPVC Tee Pipe Fitting Mould – Longxin , The product will supply to all over the world, such as: Denver, Provence, South Korea, We are fully aware of our customer's needs. We provide high quality products, competitive prices and the first class service. We would like to establish good business relationships as well as friendship with you in the near future.
  • The factory workers have a good team spirit, so we received high quality products fast, in addition, the price is also appropriate, this is a very good and reliable Chinese manufacturers.
    5 Stars By Althea from Accra - 2018.12.11 14:13
    This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Sharon from Colombia - 2017.02.14 13:19
    Write your message here and send it to us